Logistic Concept

The Profit

  • Extreme variety of materials
  • On closest area
  • In fastest access
  • With highest storage capacity
  • Machine efficiency increases, since waiting periods are void
  • Reduction of the danger of accident by security on the job
  • Less need of
    • Personnal
    • Utility places
    • Stockroom
    • Drives
    • Folk lift usage
    • Conventional storage facilities
  • No more damages through careful handling of materials
  • Stock management without shortfalls by optimized material controlling
  • Saving of time

Only by saving of time, costs per machine place are reduced by an average of 2.500 Euros monthly (empiracal value).

Sheet Metal Logistic Concept

The following PDF-Document shows you the system drawing of the Sheet Metal Logistic Concept.

Fairs

22th International Sheet Metal Working Tchnology Exhibition
Hanover
23.- 27. October 2012